Scotts Valley Transit Center Low Impact Development (LID) Retrofit Project

The Scotts Valley Transit Center LID Retrofit project proposes improvements to the existing stormwater control measures on the project site by improving water quality and increasing infiltration capacity through low impact development (LID) and landscape improvement features. All LID features will be located underground Scotts Valley Transit Center site, within existing landscaped areas, or flush with the existing grade of the site and will not disrupt the existing pedestrian or vehicle circulation on site. Landscape improvements, including efficient low water use and recycled water tolerant plantings between the parking aisles will reduce erosion and sedimentation, increase shade, and improve aesthetics.

BID DOCUMENTS: Electronic bid package provided upon registering with Scotts Valley Water District.  To request the bid documents, email engineering@svwd.org or call Eileen Eisner-Streller at 831-600-1905.

PRE-BID MEETING: A pre-bid meeting will be held in the bus terminal building at the project site (Scotts Valley Transit Center at the intersection of Kings Village Road and Bluebonnet Lane, Scotts Valley) at 1:00 p.m. on Thursday, April 14, 2016. Attendance by prospective bidders is mandatory. A bidder’s failure to attend this mandatory pre-bid meeting will make any bid submitted by the bidder unresponsive and the bidder’s bid(s) will be rejected.

Posting: 
Friday, April 1, 2016
Closing: 
Thursday, May 19, 2016 - 2:00pm
Open/Closed: 
Closed